The one thing that all construction companies want on the first day of work is a site that is clear of marsh, vegetation and rubble. When the site is clear and ready for construction, it is easier for everyone to start on time and work according to a timetable. A clean working area will benefit both the client and the construction company. Clean construction areas also allow the company to spot any sensitive areas that may prove to be problematic in future.

Safety aspects

When a construction company gets a contract to work on a building site to either build or demolish a property, the person hiring the company expects them to be as clean as possible and as safe as possible. Most building sites are in between many other buildings, and the surrounding civilians can quickly become affected by hazardous building sites. A checklist of all the responsibilities that workers need to follow will help make clearing the area easier.

According to the checklist, the grounds need to be cleared and checked thoroughly using a construction checklist to confirm that the workers did everything. This checklist will act as insurance for both parties if there is anything that would go wrong. Therefore, it is a requirement that the construction site is kept clean before the start of construction and throughout.

Hiring a skip

It is essential to bear in mind that there will be a lot of debris to clean away from the first day. While the building is being constructed, lots of waste will need to be kept far from the construction. Anything that is left lying around can be a safety hazard. A skip hire company will need to bring out the most efficient skips to the site to collect the correct type of dirt. You can discuss various sizes with the company during the consultation and figure out the right skip for you to use. Remember that there are no lights in the skip, so the advice on location will be essential when the company comes to deliver the skip. The significant part is that they will also remove it, so you have one less thing to worry about while the construction is underway.

How the clearance is done

Once a surveyor has had a look at the site to decide on the right place to construct, the following will need to be done to prepare the site:

  • The soil is tested to determine if it would be suitable for construction. Once the surveyor gets the test results, they will begin to assess the area for building on the land. When the surveyor receives all the information required, they will then relay it to the construction manager, who will then delegate the instructions to the staff.
  • Construction works will start to remove all the vegetation, trees, soil, dirt and waste. Ropes and chains are used to pull down heavier trees that construction workers cannot remove by cutting them down. Can employ a separate company before the site clearance to make the work easier for the surveyor. The less waiting that needs to be done, the sooner they can test the soil to see if it is suitable for building on.
  • The soil is then removed. The land is dug deep enough to reach the building’s lowest level using various excavation machines to explore unwanted materials and move them to a safer location.
  • A grade slope is created to push water away from the building site. Proper grading needs to be made with the exact measurement according to the level of the sand surface and the wall face of the site. Without the correct grading, the building could collapse.
  • Site compaction is then done to remove all additional air voids in the soil so that the ground becomes harder to penetrate during construction. The former many the ground, the easier it is for the building blocks and cement to settle. Compaction is a method of packing the solid bricks closely together to create better soil mass.

To conclude

Once a construction company has followed the steps above and have tested to see the water outlets and how much the water can affect the surrounding areas where they will be building. If everything comes back approved and cleared, then the company is all set to start its construction. They can then look into additional skips in Solihull to keep the area clean and clear at all times so that construction can commence immediately. The less time a construction company spends trying to keep things under control, the more likely they are to waste valuable time and miss deadlines. Hiring a skip is the best way to ensure that all the debris is placed in the correct containers as soon as the work starts. Safety is the most crucial reason construction sites need to clear the area because the testing before construction will clear the land for building and ensure no safety hazards for workers during construction.